Completed Project

MMGP Project

PCC, Substructure, Superstructure, Grade slab, Deck
slab, Screed, Tank FDN, Retaining wall, Ramp, Pedestal,
Column, Beam, Slab, Stair case, Drain, Sump pit, Duck
bank, Screen, Substation, Academic building

King Faisal Air Academy – Majma’a

The Sub-contractor shall provide necessary manpower trades to fix formwork, fixation of Steel Reinforcement, placement of in situ concrete, removal of formwork, grouping/ arranging and returning of formwork and any un-assembled formwork to the Contractor and curing activities as per requirements of the final design drawings, shop drawings and Project Specifications.

King’s College Hospital, Jeddah

Construction of 92 Bed’s Hospital at Jeddah. The scope of works comprises a Hospital Development G+5 floors with approximately 32,000m2 Gross Floor Area and a standalone car park building.
Complete Structure Concreting Works including for Main
Building & Car Parking Building

Neom Circular City Water Storage Reservoirs

Design, procurement, construction, mechanical and electrical installation, testing and commissioning of Neom Water Reservoir at Neom Circular City

King Salman Park

King Salman Park is being developed into Riyadh’s green lung,
becoming an inviting and colorful destination, rich in nature and joy and
is accessible to all. It will be a hub to imagine, innovate, collaborate and
create a new world of possibilities and experiences.

King Faisal Air Academy – Majma’a

DGDA Super Basement

The contract foresees construction of a multistory mega car park for 10,500 vehicles on three levels underground. Total built up area almost 1,000,000 square meters in Riyadh, Saudi Arabia. The project is part of a plan to develop the Ad-Diriyah historic district in Riyadh and a UNESCO heritage site. It aims to combine socio-economic development opportunities while respecting the district’s cultural identity.

DGDA Super Basement

Main Tower (25 Storeys +Office Blocks ( West Block 15 Storey and East Block 13 Storey, Podium (3 Floors Under Tower and 5 Floors Under Office Blocks) + Data Center (4 Floors including Ground Floor + 1 Basement and Roof) + Sports Center (3 Floors, Outdoor Sport Courts on Roof) + Car Park (8 Floors + Ground Floor) Scope of Work Complete Concrete Works including Piling concrete, Pile Caps, Sub-structure Concrete, Super Structure Concrete, Installation of Finishing Work including Painting, Gypsum Partition, Tiling, Marble & Granite, Secondary steel Bracket Works, Installations of other ancillary items.

RAWDAH Al-Qassim Masjid & Cultural Center

Complete Concrete Works including Sub-structure Concrete, Super Structure Concrete, Installation of Finishing Work including Painting, Gypsum Partition, Tiling, Marble & Granite, Secondary steel Bracket Works, Installations of other ancillary items.

SAUDI ELECTRIC COMPANY HQ

Brief About Project The project includes complete construction of Company Headquarters complex with 2 Basement + Four Typical Office Towers (G+4) + Central common Podium (G+2) + Restaurant & recreational building (G) + Two service building + Two Community buildings + Car Parking (4000 No’s) + Six Guard Houses including all facilities with a total built area of 331,000 Sq-m. Scope of Work Complete Concrete Works including Sub-structure Concrete, Super Structure Concrete & Electrical Works Major works : Sub-Structure Concrete : 123,992 Cum Super-Structure Concrete : 86,250 Cum

DQ Marriot Hotel - Riyadh

Brief About Project A 5 Star Hotel Facility in Diplomatic Quarters, Riyadh, which houses all Embassies and International bodies Scope of Work Complete Concrete Works including Sub-structure Concrete, Super Structure Concrete & Electrical Works Major works Quantity: Sub-Structure Concrete : 12,767 Cum Super-Structure Concrete : 16,956 Cum

Commander College

The state-of-the-art educational facility at the Saudi Capital of Riyadh.Scope of Work Complete Concrete Works including Sub-structure Concrete, Super Structure Concrete, Finishes work & Electrical Works

RAWDAH Al-Qassim Masjid & Cultural Center

Brief About Project The execution of AL-JUBAIL SWRO DESALINATION PLANT PHASE II PROJECT. Scope of Work The scope of work under subcontract shall be the concrete works including rebar fixing, installation of cathodic protection, formworks, concrete pouring etc.

Scroll to Top